Description
This powerpoint presentation begins by providing background information on recent model applications that include: water age modeling; supervisory control and data acquisition(SCADA) integrated modeling;daily operational improvements;tracking results; Total Trihalomethane(TTHM) Modeling; meet Stage 2 Disinfection Byproduct Rule; and,use distributed treatmenttechnology. Chlorine demand equivalent modelfor single chlorination station is presented, along with a 1st order saturation growth model, all-pipes TTHM Results(1st Order Model, Feb. 2007), Distribution System TTHM Removal(AWWARF No. 03103), Pilot Treatment Plant Bulk Water Tests, and Air Stripping Plant Schematics. High priorities include:plan for a full-scale air-strippingdemonstration plant at Far Hill Reservoir; development of chlorine dosing strategiesfor TTHM control; and,implementation for Stage 2 DBPRcompliance. Includes figures.
Product Details
- Edition:
- Vol. – No.
- Published:
- 11/01/2007
- Number of Pages:
- 32
- File Size:
- 1 file , 1.9 MB
- Note:
- This product is unavailable in Ukraine, Russia, Belarus