Description
This powerpoint presentation begins by providing background information on the Cleveland Division of Water’s (CWD’s) Comprehensive Financial Plan (CFP). Major issues that were addressedin the CFP included:declining consumption; rising O&M expenses; continued support of multi-year CIP,resulting in additional debt; current and futuredebt levels, over$880M in outstandingdebt;escalating rates andrate equity; suburban distribution mainreplacement needs;system expansion opportunities;new sources of revenue;automatic meter reading (AMR); and,water loss. The presentation focuses on the scope of services, including:water rate study;cost of service study;water system expansion study;new products and services study;feasibility study of AMR and conversion tomonthly billing;unmetered water audit report; and,public outreach component. Includes figures.
Product Details
- Edition:
- Vol. – No.
- Published:
- 09/01/2007
- Number of Pages:
- 34
- File Size:
- 1 file , 1.7 MB
- Note:
- This product is unavailable in Ukraine, Russia, Belarus