Description
This slide presentation outlines a project where Arsenic Rule design decisions affected full-scale construction costs at Victor Valley Water District (VVWD) in California. The presentation outline included: background on VVWD;initial technology evaluation that included iron based sorbents,coagulation/filtration, and ion exchange;focused technology evaluation based on performance and economic analyses determined that C/F and IX deserved more thorough evaluation, RFP issuedwith two tasks of comparing C/F versus IX anddesign of selected technology, non-economic evaluation criteria,economic evaluation criteria;other factors;final selection;pilot testing;selected technology including coagulation/filtration;residual disposal options including sewer discharge for all or part ofbackwash water, haul off liquid waste, mechanical/chemical treatment of waste, anddrying beds;hydraulic considerations; and,design becomes (virtual) reality. Includes tables, figures.
Product Details
- Edition:
- Vol. – No.
- Published:
- 06/01/2006
- Number of Pages:
- 43
- File Size:
- 1 file , 9.5 MB
- Note:
- This product is unavailable in Ukraine, Russia, Belarus