Description
This slide presentation gives information on a recharge feasibility assessment that was done for the City of Phoenix North Gateway Water Reclamation Plant. Topics covered include: geophysics and seismic data usedto detect potential basalt flows atdepth;”target” recharge zonesidentified as 45-55 and 150-235ft bls;recharge capacities estimatedto be 350 to 500 gpm;short term (3-4 weeks) singlewell tests validate estimates; and,350-360 gpm actual.
Product Details
- Edition:
- Vol. – No.
- Published:
- 06/15/2003
- Number of Pages:
- 14
- File Size:
- 1 file , 6.8 MB
- Note:
- This product is unavailable in Ukraine, Russia, Belarus