Description
This powerpoint presentation begins by providing a brief overview of a phased expansion plan for the Yuba City water treatment plant. Alternatives for plant expansion are presented, and an upgrade of the existing Flocculation/Sedimentation basins was selected that included anexpansion with submerged membranes. Submerged membrane design is presented, along with the CIP/backwash system, important factors for submergedmembrane retrofit, commissioning and start-up issues, commissioning data and summary, and operating data. Includes tables, figures.
Product Details
- Edition:
- Vol. – No.
- Published:
- 11/01/2008
- Number of Pages:
- 26
- File Size:
- 1 file , 1.3 MB
- Note:
- This product is unavailable in Ukraine, Russia, Belarus