AWWA ACE69003 Digital PDF

$14.00

LT2ESWTR Compliance for the Fallbrook PUD Red Mountain Reservoir
Conference Proceeding by American Water Works Association, 11/01/2008

Document Format: PDF

Description

This powerpoint presentation begins by presenting a brief overview of the LT2ESWTR as a regulatory driver: concerned with uncoveredfinished water reservoir provisions;separate from “Toolbox”;”Inactivation and/or Removal”; and,enabling technology – UV. Process options are presented, along withphysical setting,system hydraulics,water quality,equipment pre-selection, andfacility design. Presentation conclusions indicate the following:UV/Cl2/NH2Cl system received conditionalapproval;health official(s) input attechnology/approach screening, validationworkshop, 30%, 60%, and 90% design;system sized for future flow and waterquality challenges;successful pre-selection;project going to bid in late-2008; and,construction and start-up in 2009. Includes tables, figures.

Product Details

Edition:
Vol. – No.
Published:
11/01/2008
Number of Pages:
26
File Size:
1 file , 2.2 MB
Note:
This product is unavailable in Ukraine, Russia, Belarus