AWWA ACE70616 Digital PDF

$14.00

Using Trenchless Construction and Upfront Planning to Minimize Public Impacts during Rehabilitation of a 16-inch PVC Recycled Water Transmission Main
Conference Proceeding by American Water Works Association, 11/01/2009

Document Format: PDF

Description

This powerpoint presentation begins by providing a brief overview of the Oak Park/North Ranch recycled water system. The 2006 failure is presented, along with rehabilitation method selection, material selection, design considerations, thrust restraint, supply outages, temporary supplies, shutdown schematics in contract documents, traffic issues and mitigation, and public outreach.

Product Details

Edition:
Vol. – No.
Published:
11/01/2009
Number of Pages:
27
File Size:
1 file , 4.9 MB
Note:
This product is unavailable in Ukraine, Russia, Belarus