Description
This slide presentation outlines an effort by the City of Hamilton to rehabilitate its water mains using cured-in-place pipe structural liners. Key program objectives included: minimize the impact on the City’s contractmanagement overhead while maintaining quality; minimize the impact to the Capital budget;deliver an acceptable level of service whileminimizing disruption to the public;performance based; and,return on investment (ROI). Topics covered include: program based contracts; tender type and award; best value award; CIPP structural lining and technology; pulled-in-place installation process; liner installation; and, benefits. Includes tables, figures.
Product Details
- Edition:
- Vol. – No.
- Published:
- 09/01/2006
- Number of Pages:
- 37
- File Size:
- 1 file , 3.3 MB
- Note:
- This product is unavailable in Ukraine, Russia, Belarus