Description
The Tustin nitrate removal project involves the planning, design, construction, and operation of a nitrate removal plant jointly owned and operated by the Orange County Water District and the City of Tustin, California. This paper covers plant operation from March 8, 1990, through January 31, 1993. The author discusses system design, system performance and operation, and project costs.
Product Details
- Published:
- 01/01/1993
- ISBN(s):
- 0898677076
- Number of Pages:
- 15
- File Size:
- 1 file
- Note:
- This product is unavailable in Ukraine, Russia, Belarus