Description
This powerpoint presentation begins by providing a brief overview of the city of Hutchinson, Minnesota, and the water treatment plant (WTP) site location. Key issues included the following:exceeding copper corrosion standards as defined in theLead & Copper Rule (LCR) in distribution system;chlorine demands were significantly different between thetwo treatment trains using the same water supply;high iron concentration;biological growth occurring within distribution systems;disinfection byproduct (DBP) formation; and,aging facilities. Key issues were resolved with the following results:copper corrosion standards achieved;2007 CCR: 0.62 mg/L;uncontrollable chlorine demands;previously chlorine application varied with water production, now chlorine application H chlorine residual desired, ammonia reduced to 0.02 mg/L, andchlorine feed controllable; and,high iron concentration, Raw Water Iron concentration of 2.6 mg/L,existing plan generally controlled Iron below 0.30 mg/L, andfinished water Iron = 0.01 mg/L. Includes tables, figures.
Product Details
- Edition:
- Vol. – No.
- Published:
- 11/01/2008
- Number of Pages:
- 20
- File Size:
- 1 file , 2.4 MB
- Note:
- This product is unavailable in Ukraine, Russia, Belarus