SAE AIR6364 Digital PDF

$56.00

Test Facility Shakedown and Commissioning
standard by SAE International, 11/29/2017

Document Format: PDF

Description

SAE AIR6364 discusses in general terms the activities required to be undertaken or demonstrated during the establishment of the facility such as:

  • the assessment checks prior to forwarding to the end users site for embodiment into the facility system
  • the establishment of the facility such as trial installations of hardware, functionality checking of lifting transportation and access systems, centerline pull checks, pressure testing of fuel and air start systems, flushing of wet systems and electrical continuity checking.
  • the commissioning of the facility such as instrumentation calibrations, engine starts, engine running, assessment of command and control system, assessment of DAS system, aerodynamic and acoustic surveys.

Product Details

Published:
11/29/2017
Number of Pages:
13
File Size:
1 file , 480 KB
Note:
This product is unavailable in Ukraine, Russia, Belarus